Home / Resources / Solutions library
Packing and dispatch
Speed up packing and dispatch
A packing bench with materials fed from behind and tools above.

The problem
Packers walk to fetch cartons, tape and labels, and orders back up at the end of the line.
Why it happens
Packing materials are stored away from the bench, and the station is not laid out in the order the work is done.
How the setup comes together
- Lay out the bench in the order of packing: product, carton, fill, seal, label.
- Mount rolls and cutters above the worktop.
- Feed cartons and products from a flow rack behind the packer.
- Move packed goods on a trolley to dispatch.
What changes
Packers stay at the bench, materials are always at hand and dispatch keeps pace with production.
Related solutions.

Assembly
Stop operators searching for tools at the assembly station
Give every tool a fixed place within arm's reach of the operator.
Manufacturing, Automotive, Aerospace & aviation
Electronics assembly
Protect electronic assemblies from static damage at the bench
An ESD-controlled bench with grounding built in, not added later.
Manufacturing, Aerospace & aviation, Healthcare, Education & training
Sub-assembly
Keep sub-assembly work in progress staged and traceable
Separate zones for parts in, work in progress and finished modules.
Manufacturing, AutomotiveWant this setup in your space?
Share your layout, the work done there and how many people use it. We'll size this solution from standard modules.
