Home / Resources / Case studies Case study · 17 November 2026

Assembly Workstations for Fire Suppression Valves, on a Five-Week Timeline

Workbenches with rubber-matted postform tops and Link Uprighters carrying tube lights, tool rails with spring balancers, pegboards and power rails, configured after a showroom visit.

Assembly workstations with uprighter, tool rail and task lighting
Industry
Fire safety equipment
Application area
Valve assembly
Furnisys systems
Workbench with Link Uprighter
Engagement
Showroom visit and product configuration

A factory expansion with a fixed date

Situation

The client makes fire extinguishers, CO₂, wet chemical and inert gas suppression systems, control units and heat detection tubing. A factory expansion meant they needed more assembly workstations, within four to five weeks.

Twenty-six sub-components per valve

The challenge

The client visited the Furnisys office and showroom to see the products and explain their process. Their assembly involves ILP (in-line pressure) and DCP (differential control pressure) valves joined with end connectors. They needed bench vices, pegboards for torque wrenches, spanners and screwdrivers, bins for the 26 sub-components of differential valves, and a tool rail with spring balancer for pneumatic tools.

How do you fit 26 parts and a pneumatic tool into arm's reach?

The question

How do you keep every sub-component and tool within reach at a compact, ergonomic station, and deliver it in time for a factory opening?

A workbench with everything on the uprighter

The Furnisys approach

Workbenches with postform laminated worktops and rubber mats. The mats stop debris building up during tapping operations and protect the worktop. A Link Uprighter on each bench carries:

  • Fixed tube light assembly with reflector
  • Tool rail with spring balancer for pneumatic tools
  • Pegboard with spanner trays, Allen key holders, screwdriver holders, medium slotted hooks and bin strips
  • Horizontal power rail
Workbench with Link Uprighter, tool rail and pegboard
Workbench with Link Uprighter, tool rail and pegboard

Parts in bins, tools on hooks, air tool overhead

How the setup works together

Sub-components sit in labelled bins at eye level, hand tools on the pegboard, and the pneumatic tool hangs on its balancer above the vice. Operators assemble valves without reaching across the bench or leaving the station.

What the client received

What the configuration enabled

  • Assembly stations planned around the client's own process walkthrough
  • Clean worktops during tapping, protected by rubber mats
  • Reduced fatigue with balanced pneumatic tools
  • A configuration fixed early enough to meet the expansion schedule

Seeing is deciding

Furnisys perspective

A showroom visit lets clients test accessories in person and describe their process in detail. It often shortens the path from brief to configuration.

Frequently asked questions

What does a valve assembly station for fire safety equipment need?

A bench vice, bins for sub-components, a pegboard for hand tools, a tool rail with spring balancer for pneumatic tools, good lighting and power.

Why put a rubber mat on an assembly worktop?

It keeps debris from tapping operations off the surface and protects the worktop, extending its life.

Can I see Furnisys products before ordering?

Yes. Clients can visit our office and showroom to see configurations and accessories in person.

Have a similar project?

Share your brief and a workspace specialist will configure the right system for it.

Chat on WhatsApp